Previous
Previous Product Image

Improved monthly runoff time series prediction using the CABES-LSTM mixture model based on CEEMDAN-VMD decomposition

$0.00
Next

The changes prediction on terrestrial water storage in typical regions of China based on neural networks and satellite gravity data

$0.00
Next Product Image

Research on collaborative task scheduling and cooperative control strategy for construction robots based on improved particle swarm optimization algorithm

$0.00

Research on collaborative task scheduling and cooperative control strategy for construction robots based on improved particle swarm optimization algorithm

$0.00

Research Materials Available – Subject to Confirmation
• Theoretical Work
• Math Analysis
• Equations
• LaTeX field
• Documentation
Research materials: Availability, pricing, and conditions will be checked. Then, a detailed offer will be provided. Please note: Availability and pricing are subject to author confirmation.

Add to Wishlist
Add to Wishlist

Reviews

There are no reviews yet.

Be the first to review “Research on collaborative task scheduling and cooperative control strategy for construction robots based on improved particle swarm optimization algorithm”

Your email address will not be published. Required fields are marked *

Vendor Information

  • No ratings found yet!
ResearchBack logo – Academic Marketplace for Research Materials

ResearchBack is the leading multivendor academic marketplace for research materials. Buy and sell simulations, datasets, code, and methodologies from verified researchers and institutions worldwide. Discover content from engineering, physical sciences, and beyond — all peer-aligned and ready for academic use.

Copyright © 2025 | ResearchBack – Academic Marketplace for Datasets, Code & Simulations. All Rights Reserved.

Shopping cart

0
image/svg+xml

No products in the cart.

Continue Shopping